Friday, August 8, 2008
Dining room? Check.
It's painted... this was a big leap of color, even for me. I want to get a custom sized tablecloth made and possibly some slip covers, just for the backs of the 2 chairs at the head and foot of the table. The accent colors will remain black and white, with silver/pewter accessories.
Wednesday, July 23, 2008
Now we're talking
Thursday, July 3, 2008
A little at a time!
Friday, June 27, 2008
Moved in!
Thursday, June 5, 2008
Monday, June 2, 2008
carpet's in!
We have carpet - in too many places in fact! (they installed it in the office - see bottom picture, which is supposed to be hardwood). Should be fixed by tommorow (fingers crossed).
playroom upstairs:

master bedroom:


office:

There is also carpet in the kids' bedrooms. Otherwise the house is tile/wood flooring.
And here is what's left to do... quite a few changes need to be made. We hadn't realized them all until recently!
These built-ins behind the kitchen are actually both supposed to be desks (see bottom picture):


The dining room needs a chair rail:

These steps off the back porch should be on the other side (leading to a future patio/deck):

Not pictured is a large rock under the sod, which we feel is a safety hazard for the kids, gutters on sides and back of the house, the electrical and gas issues mentioned previously, and a few clean-up/touch-ups.
We are headed to Utah for the next 2-3 weeks, or however much longer they need to finish up. Our contract here in the apartment ends on Friday so we'll head out that day. I may update once or twice more, depending on what gets done this week. Otherwise, the next batch of pictures will be taken as official occupants!
playroom upstairs:
master bedroom:
office:
There is also carpet in the kids' bedrooms. Otherwise the house is tile/wood flooring.
And here is what's left to do... quite a few changes need to be made. We hadn't realized them all until recently!
These built-ins behind the kitchen are actually both supposed to be desks (see bottom picture):
The dining room needs a chair rail:
These steps off the back porch should be on the other side (leading to a future patio/deck):
Not pictured is a large rock under the sod, which we feel is a safety hazard for the kids, gutters on sides and back of the house, the electrical and gas issues mentioned previously, and a few clean-up/touch-ups.
We are headed to Utah for the next 2-3 weeks, or however much longer they need to finish up. Our contract here in the apartment ends on Friday so we'll head out that day. I may update once or twice more, depending on what gets done this week. Otherwise, the next batch of pictures will be taken as official occupants!
Thursday, May 29, 2008
Patience is a virtue
... which I do not own. This is what I was warned about... enduring to the end. Because the end seems to DRAG. They are so closed to being finished I can taste it. I can smell it, I can feel it, and unfortunately I can see it. So finish already!!!!
Sigh. Carpeting and wood flooring await. They also need to move our patio steps, which were done on the wrong side. And finish installing gutters. That's it. That is it! Pray we close soon... very, very soon. I am not sure how much longer these kids can take this tiny apartment!
Sigh. Carpeting and wood flooring await. They also need to move our patio steps, which were done on the wrong side. And finish installing gutters. That's it. That is it! Pray we close soon... very, very soon. I am not sure how much longer these kids can take this tiny apartment!
Subscribe to:
Posts (Atom)
