Well, our pre-dry wall walk through is on Tuesday! The roof is just about done. All the electrical wiring has been completed. We have water heaters and vents installed. The fireplace is in, our jetted bathtub is going in. The stucco, stone and brick is ready to go up. There are even a few decorative touches on the exterior already.
Some decorative detailson the exterior:
vents:
fireplace:
jetted master tub!
playroom:
stairwell:
kitchen:
The family planning center will go in this nook (contains a built-in desk on either side):
Love these rounded doorways!
Sunday, March 23, 2008
Sunday, March 16, 2008
filling in!
frame, second floor
Saturday, March 1, 2008
frame, first floor
we have a foundation, baby!
Subscribe to:
Posts (Atom)